We are pleased that refurbishment work at Tycoch is starting and therefore we will be relocating Reception from the front of the Tycoch Campus to the old Faculty Office in the Engineering Block with effect from Monday 13 February.
Signs will be put up to direct the public. Parking will also be available for disabled badge holders and visitors outside the new Reception area.
For access to the Canteen, E Block and the Hall, please use the entrance near the lift located adjacent to Café Metro. Toilet facilities at the front of Tycoch will be available in the following areas:
- Next to the Main Hall, which will be accessible from the entrance near the lift located adjacent to Café Metro;
- Near the ramp (A Floor Corridor) by the original front Reception area which will be accessible only from the A Floor corridor.
Also, the pathway between Hill House and Tycoch will be closed from Monday 13 February with work re-commencing on the roadway. A temporary path will be put in place with further details to follow.